Energy Figures

How big is Emerald Solar Park?

72 MW

Capacity, AC

Lighthouse Infrastructure Management Limited

  • 66 to 132 kV
  • 220 to 275 kV
  • 330 kV
  • 500 kV
  • Operating solar farm
  • In the pipeline
  • Approximate location (postcode or referral area centre)
  • EPBC referral area
Fig. 1 · Solar farms: AEMO, Geoscience Australia, CER, DCCEEW EPBC referrals · Oct 2026 · Basemap and farm outlines © OpenStreetMap contributors
Status
Operating
Council area
Central Highlands (Qld)
State
QLD

Every solar farm in Central Highlands (Qld)

Straight-line distance

Nearest solar farms

Solar farms nearest Emerald Solar Park
Solar farmStatusCapacityDistance
Gregory Solar FarmProposedNot published51 km
Lilyvale Solar FarmOperating118 MW55 km
Lilydale Solar FarmOperating100 MW56 km
Clermont Solar FarmOperating93 MW93 km
Middlemount Solar FarmOperating30 MW121 km

Questions

Where does this come from?

Emerald Solar Park is listed by Geoscience Australia, AEMO Generation Information, the Clean Energy Regulator (CER). Capacity is AEMO's AC figure where AEMO lists the farm, else Geoscience Australia's, else the CER's installed capacity. Its location is Geoscience Australia's. The outline on the map is from OpenStreetMap (© OpenStreetMap contributors).

How are sheep, cattle and crops checked?

Records are found by automated web search and confirmed by code checks plus two independent automated classifiers; no person reviews them. A quote is shown only when its page is online, the quote appears on it word for word, the page names this farm close to the quote, and both classifiers agree on whether it says sheep, cattle or crops, now or planned. Descriptions of the land before the farm was built are not shown. "No public record" means nothing was found, not that there is none. Agrivoltaics, or agrisolar, means producing solar power and farming on the same land; this site lists what public pages say and does not rate any farm.