Energy Figures

How big is Greentech 4 Solar Farm & BESS?

7 MW

Capacity, AC

  • 66 to 132 kV
  • 220 to 275 kV
  • 330 kV
  • 500 kV
  • Operating solar farm
  • In the pipeline
  • Approximate location (postcode or referral area centre)
  • EPBC referral area
Fig. 1 · Solar farms: AEMO, Geoscience Australia, CER, DCCEEW EPBC referrals · Oct 2026 · This farm is placed at the centre of its postcode · Basemap and farm outlines © OpenStreetMap contributors
Status
Operating
Council area
Central Goldfields
State
VIC

Every solar farm in Central Goldfields

Straight-line distance

Nearest solar farms

Solar farms nearest Greentech 4 Solar Farm & BESS
Solar farmStatusCapacityDistance
Greentech 7 Solar Farm & BESSOperating8.5 MW76 km
Greentech 8 Solar Farm & BESSOperating6.5 MW81 km
Bendigo Project Solar Farm & BESSOperating7 MW89 km
Axedale Solar Farm and Battery Energy Storage SystemAnticipated140 MW89 km
Greentech 1 Solar Farm & BESSOperating7 MW94 km

Questions

Where does this come from?

Greentech 4 Solar Farm & BESS is listed by the Clean Energy Regulator (CER). Capacity is AEMO's AC figure where AEMO lists the farm, else Geoscience Australia's, else the CER's installed capacity. No source gives this farm's own location, so the map places it at the centre of its postcode.

How are sheep, cattle and crops checked?

Records are found by automated web search and confirmed by code checks plus two independent automated classifiers; no person reviews them. A quote is shown only when its page is online, the quote appears on it word for word, the page names this farm close to the quote, and both classifiers agree on whether it says sheep, cattle or crops, now or planned. Descriptions of the land before the farm was built are not shown. "No public record" means nothing was found, not that there is none. Agrivoltaics, or agrisolar, means producing solar power and farming on the same land; this site lists what public pages say and does not rate any farm.