- 66 to 132 kV
- 220 to 275 kV
- 330 kV
- 500 kV
- Operating solar farm
- In the pipeline
- Approximate location (postcode or referral area centre)
- EPBC referral area
- Status
- Operating
- Council area
- Burdekin
- State
- QLD
Straight-line distance
Nearest solar farms
| Solar farm | Status | Capacity | Distance |
|---|---|---|---|
| Cambridge Solar Farm and Battery Energy Storage System | Proposed | Not published | 1.4 km |
| Haughton Solar Farm Stage 1 | Operating | 133 MW | 1.8 km |
| Burdekin Solar Farm | Proposed | 500 MW | 19 km |
| Clare Solar Farm | Operating | 110 MW | 20 km |
| Majors Creek Solar Power Station | Anticipated | 180 MW | 26 km |
Questions
Where does this come from?
Haughton River Solar Farm is listed by Geoscience Australia. Capacity is AEMO's AC figure where AEMO lists the farm, else Geoscience Australia's, else the Clean Energy Regulator's installed capacity. Its location is Geoscience Australia's.
How are sheep, cattle and crops checked?
Records are found by automated web search and confirmed by code checks plus two independent automated classifiers; no person reviews them. A quote is shown only when its page is online, the quote appears on it word for word, the page names this farm close to the quote, and both classifiers agree on whether it says sheep, cattle or crops, now or planned. Descriptions of the land before the farm was built are not shown. "No public record" means nothing was found, not that there is none. Agrivoltaics, or agrisolar, means producing solar power and farming on the same land; this site lists what public pages say and does not rate any farm.