How much large solar is operating or in the pipeline in Dubbo?
826
MW of large solar farms operating or in the pipeline
NSW council area · 7,535 km²
- 66 to 132 kV
- 220 to 275 kV
- 330 kV
- 500 kV
- Operating solar farm
- In the pipeline
- Approximate location (postcode or referral area centre)
- EPBC referral area
- Operating
- 826 MW
- Solar farms
- 4
- Farms with livestock or crops on site
- 1
Source AEMO, CER, Geoscience Australia · 4 Oct 2026
Solar farms
| Solar farm | Status | Capacity | Livestock or crops |
|---|---|---|---|
| Wellington North Solar Farm (approximate location) | Operating | 437 MW | No public record |
| Wellington South Solar Farm (approximate location) | Operating | 216 MW | Sheep |
| Suntop Solar Farm | Operating | 158 MW | No public record |
| South Keswick Solar Farm (approximate location) | Operating | 14 MW | No public record |
Source Geoscience Australia · 66 kV and above · From the area's centre
Nearest substations
| Substation | Voltage | Distance from area centre |
|---|---|---|
| Geurie | 66 kV | 1.5 km |
| Wellington | 330 kV | 15 km |
| Wellington West | 330 kV | 17 km |
Source Global Solar Atlas 2.0, Solargis · Mean of 10,399 cells of about 1 km
Average solar yield
1,719 kWh per kWp a year
Yield higher than 19% of Australia’s land
Questions
What counts as in the pipeline?
In the pipeline is every farm that is commissioning, committed, anticipated or proposed (publicly announced, or referred for approval). The headline adds those to every operating farm. Withdrawn projects are not counted. A farm with no published capacity is listed but adds no MW. A farm placed at the centre of its postcode or EPBC referral area, because no source gives its own location, counts in the council area that point falls in. Here: 826 MW operating across 4 farms, 0 MW in the pipeline across 0.
What do committed and anticipated mean?
They are AEMO's stages in its Generation Information. Committed: the project has known timing and satisfies all five of AEMO's commitment criteria, or four of them with the planning or contracts criterion partly met. Anticipated: it is sufficiently progressed towards meeting at least three of the five. Publicly announced: announced, but not yet far enough along to be anticipated or committed.
Where does the data come from?
Solar farms: AEMO under its copyright permissions, with attribution; the Clean Energy Regulator (CER) under CC BY 4.0; Geoscience Australia under CC BY 4.0. Each farm is placed in the council area its point falls in, using the ABS 2025 council boundaries (CC BY 4.0). Substations: Geoscience Australia's electricity infrastructure layer (CC BY 4.0), operational substations of 66 kV and above. The substation distances are straight lines from the centre of the council area, not from any farm.
Why do some farms say approximate location?
3 farms are placed at the centre of their postcode or EPBC referral area, because no source gives their own location, so their council area is approximate. They count in the headline.
Why is a solar farm I know missing?
A farm appears here only once a public source gives its location. The sources for this area are AEMO, CER, Geoscience Australia. Large solar farms are grid-scale power stations. Rooftop solar is not counted.
Which of these farms also farm the land?
Agrivoltaics means farming the same land as a solar farm, usually grazing sheep under the panels. Where a public source says sheep, cattle or crops are on site now, the table says so. No public record means nothing was found, not that there is no grazing.