- 66 to 132 kV
- 220 to 275 kV
- 330 kV
- 500 kV
- Operating solar farm
- In the pipeline
- Approximate location (postcode or referral area centre)
- EPBC referral area
- Status
- Operating
- Council area
- Mount Isa
- State
- QLD
Straight-line distance
Nearest solar farms
| Solar farm | Status | Capacity | Distance |
|---|---|---|---|
| Sybella Creek Solar Farm | Committed | 72 MW | 121 km |
| Muckaty Solar Precinct | Proposed | Not published | 560 km |
| Hughenden Sun Farm | Operating | 21 MW | 591 km |
| Kidston Solar Project Phase Two | Proposed | 270 MW | 613 km |
| Kidston Solar Project Phase One | Operating | 50 MW | 670 km |
Questions
Where does this come from?
Mica Creek Solar Farm is listed by the Clean Energy Regulator (CER). Capacity is AEMO's AC figure where AEMO lists the farm, else Geoscience Australia's, else the CER's installed capacity. No source gives this farm's own location, so the map places it at the centre of its postcode.
How are sheep, cattle and crops checked?
Records are found by automated web search and confirmed by code checks plus two independent automated classifiers; no person reviews them. A quote is shown only when its page is online, the quote appears on it word for word, the page names this farm close to the quote, and both classifiers agree on whether it says sheep, cattle or crops, now or planned. Descriptions of the land before the farm was built are not shown. "No public record" means nothing was found, not that there is none. Agrivoltaics, or agrisolar, means producing solar power and farming on the same land; this site lists what public pages say and does not rate any farm.