Energy Figures

How big is Northern Midlands Solar Farm?

316 MW

Capacity, AC

TasRex Pty Ltd

Suggest a correction
  • 66 to 132 kV
  • 220 to 275 kV
  • 330 kV
  • 500 kV
  • Operating solar farm
  • In the pipeline
  • Approximate location (postcode or referral area centre)
  • EPBC referral area
Fig. 1 · Solar farms: AEMO, Geoscience Australia, CER, DCCEEW EPBC referrals · Oct 2026 · This farm is placed at the centre of its EPBC referral area · Basemap and farm outlines © OpenStreetMap contributors
Status
Anticipated
Council area
Northern Midlands
State
TAS
Livestock or crops
Planned

Every solar farm in Northern Midlands

Sheep, cattle or crops on site

Public source: grazing planned

“Tasmania’s first solar farm will host “a couple of thousand” sheep and is a perfect solution for delicate pasture, says the landowner who is behind the $500 million Northern Midlands Solar Farm.”
Grazing planned · Tasmania's first solar farm to host 2000 sheep as agrisolar takes off (archived copy) · Checked 4 Oct 2026

Straight-line distance

Nearest solar farms

Solar farms nearest Northern Midlands Solar Farm
Solar farmStatusCapacityDistance
Weasel Solar FarmProposed260 MW51 km
Bell Bay Solar ProjectOperating8.5 MW83 km
Barwon Solar Farm and BESSProposed250 MW497 km
Wangaratta Solar FarmOperating26 MW580 km
Meadow Creek Solar FarmProposed180 MW593 km

Questions

Where does this come from?

Northern Midlands Solar Farm is listed by AEMO Generation Information, an EPBC referral to the Department of Climate Change, Energy, the Environment and Water (DCCEEW). Capacity is AEMO's AC figure where AEMO lists the farm, else Geoscience Australia's, else the Clean Energy Regulator's installed capacity. Its location is the centre of the area referred under the EPBC Act, which can be larger than the farm. The dashed line on the map is the area referred under the EPBC Act, not the farm's footprint.

How are sheep, cattle and crops checked?

Records are found by automated web search and confirmed by code checks plus two independent automated classifiers; no person reviews them. A quote is shown only when its page is online, the quote appears on it word for word, the page names this farm close to the quote, and both classifiers agree on whether it says sheep, cattle or crops, now or planned. Descriptions of the land before the farm was built are not shown. "No public record" means nothing was found, not that there is none. Agrivoltaics, or agrisolar, means producing solar power and farming on the same land; this site lists what public pages say and does not rate any farm.