How big is Sebastopol Solar Farm?
90 MW
Capacity, AC
Sebastopol Asset Co Pty Ltd ATF Sebastopol Asset Trust
- 66 to 132 kV
- 220 to 275 kV
- 330 kV
- 500 kV
- Operating solar farm
- In the pipeline
- Approximate location (postcode or referral area centre)
- EPBC referral area
- Status
- Operating
- Council area
- Temora
- State
- NSW
- Livestock or crops
- Sheep
Sheep, cattle or crops on site
Public source: sheep graze on site
“This allows sheep to continue to graze in and around them now the solar farm is operational.”
Straight-line distance
Nearest solar farms
| Solar farm | Status | Capacity | Distance |
|---|---|---|---|
| Temora 1C Solar Farm | Operating | 6.1 MW | 0.0 km |
| Junee Solar Farm | Operating | 36 MW | 26 km |
| Cootamundra Solar Farm | Operating | 5.8 MW | 43 km |
| West Wyalong Solar Farm | Operating | 105 MW | 74 km |
| Wyalong Solar Farm | Operating | 62 MW | 80 km |
Questions
Where does this come from?
Sebastopol Solar Farm is listed by AEMO Generation Information, the Clean Energy Regulator (CER). Capacity is AEMO's AC figure where AEMO lists the farm, else Geoscience Australia's, else the CER's installed capacity. No source gives this farm's own location, so the map places it at the centre of its postcode. The outline on the map is from OpenStreetMap (© OpenStreetMap contributors).
How are sheep, cattle and crops checked?
Records are found by automated web search and confirmed by code checks plus two independent automated classifiers; no person reviews them. A quote is shown only when its page is online, the quote appears on it word for word, the page names this farm close to the quote, and both classifiers agree on whether it says sheep, cattle or crops, now or planned. Descriptions of the land before the farm was built are not shown. "No public record" means nothing was found, not that there is none. Agrivoltaics, or agrisolar, means producing solar power and farming on the same land; this site lists what public pages say and does not rate any farm.